Dataset Factory★ EST. 2026 · BEST AT 800×600 ★
★ WELCOME TO THE DATASET FACTORY ★ PUBLIC DATA → CHECKED BUILDS → HONEST BASELINES ★ NO POP-UPS ★ NO COOKIES ★ NO TRACKERS ★ HAND-MADE HTML ★ UNDER CONSTRUCTION SINCE THE NINETIES ★
Release notes · 2026-11-10 · announcement

NIH R01 Competing Renewal

Suitability and evaluation

Evaluation setting: retrospective research. Read the prediction setting and limitations below. Public validation is development data; downloadable holdout labels must stay outside the evaluated agent workspace.

When NIH announces a brand-new R01 award, will that project later be continued through a competing-renewal award on the same core project number, or will the project end without one?

Population: Extramural R01 awards in the annual NIH ExPORTER project files with APPLICATION_TYPE code 1 (new), SUPPORT_YEAR code 1, ACTIVITY code R01, non-missing PROJECT_START, AWARD_NOTICE_DATE and ORG_STATE, and AWARD_NOTICE_DATE from 2007-10-01 through 2017-09-30 (federal fiscal years 2008-2017). The released splits ship fiscal years 2008-2012 to train, 2013-2014 to eval, and 2015-2016 to holdout; the FY2017 cohort is held back outside the three release files as a post-holdout drift audit. Excludes other application types, contracts with N-prefix codes, intramural Z-prefix codes, and projects whose first-year record is missing. Eligibility uses only fields visible on the award record at the decision instant.

Target: y = 1 if the same CORE_PROJECT_NUM has any award record with APPLICATION_TYPE = 2 (competing continuation / competing renewal) whose BUDGET_START is strictly after the initial PROJECT_START and no later than initial PROJECT_START + 6 years; y = 0 if no such record exists and the cohort's full 6-year window is observed in the data cutoff. Rows whose window is not fully observed are dropped, never labeled 0.

Prediction time: The award notice date (AWARD_NOTICE_DATE) printed on the project first-year record, the moment the new award becomes public. Features use only fields printed on that first-year record or histories built from R01 award records with AWARD_NOTICE_DATE strictly earlier than the row notice date.

Splits: One row per new award; assignment by AWARD_NOTICE_DATE with hard fiscal-year boundaries (Oct 1 - Sep 30) and no shuffling: train FY2008-FY2012, eval FY2013-FY2014, holdout FY2015-FY2016; FY2017 is held back as a post-holdout drift check and never used for tuning. No calendar embargo gap is imposed, because every feature for a row is restricted to records dated strictly before that row's notice date, and every label uses only post-decision records of that same core project; instead right-censoring is enforced by requiring the full 6-year window to be observed at the data cutoff. Identity/aggregate features additionally obey the rule that they may use only cohorts whose outcome window closed before the decision instant, so a later row can never disclose an earlier row's target.

Outcome horizon: 6 years from the initial PROJECT_START (typical R01 project periods are 3-5 years, so the first competing renewal normally begins in year 4-6); cohorts through FY2017 are fully observed using files through FY2023.

Inputs: administering_ic: Two-character NIH institute or center code administering the award; captures institute-specific continuation norms and paylines.; study_section: Review panel code that evaluated the funded application; proxies field and review culture. The panel name text is not shipped to avoid duplicate text.; ed_inst_type: NIH grouping of the grantee organization component type, such as medical school, other college, hospital or business.; org_state: Two-letter grantee business-office state; institutional location and clustering. Required non-missing for population eligibility.; org_country: Grantee business-office country; institutional location and foreign or domestic status.; org_ipf_code: Stable NIH institution identifier for the grantee organization; institutional capacity and high-cardinality identity control.; total_cost: First-year total award amount, direct plus indirect; treated as an award-time value because later administrative revisions are possible.; direct_cost_amt: First-year direct cost component; indirect share proxies institutional facilities and administrative rate.; indirect_cost_amt: First-year indirect cost component; proxies institutional facilities and administrative rate.; project_start_month: Calendar month of PROJECT_START, giving within-year timing while remaining visible at notice.; multi_pi_count: Number of distinct PI identifiers on the first-year record; single-PI versus multi-PI structure.; pi_prior_r01_count: Maximum number of distinct earlier R01 core projects held by any listed PI, measuring established versus first-time R01 holders without using labels.

→ Open the dataset page for numbers, files and checksums

★ THANKS FOR VISITING · BOOKMARK THIS PAGE · TELL A FRIEND ABOUT THE DATASET FACTORY · SIGN THE GUESTBOOK BEFORE YOU LEAVE ★